Analisis Waste Pembuatan Tahu Untuk Perbaikan Kualitas Dengan Menetapkan Waktu Standar
DOI:
https://doi.org/10.31004/joecy.v5i2.3014Keywords:
Quality Improvement, Standard Time Measurement, Waste, Standard Operating ProcedureAbstract
Mahrup Cibogo Tofu Factory is a small-scale business that has been producing white and yellow tofu since 1979, founded by Mr. Mahrup. Currently, the factory is facing quality issues such as defective products including misshapen tofu, tofu with holes on the surface, inconsistent sizes, and contamination. These defects are mainly caused by time inefficiencies in the production process due to the absence of established standard time and lack of a Standard Operating Procedure (SOP), leading workers to rely on their personal experience without consistency. This research aims to assist the factory by analyzing the root causes of product defects and determining standard times for each production stage. Tools like histograms, Pareto diagrams, P-Charts, and fishbone diagrams are used to identify the defects, while work time measurements are used to calculate standard time. The results show that the most common defect is shape damage at 31.6%. The total standard time for the complete tofu production process is 217.68 minutes (3 hours and 38 minutes). The proposed improvements include implementing the suggested SOP to minimize waste, control product quality, and provide clear work guidelines for employees
References
Ardhyani, I. W., Garini, S. A., Suhartiningrum, F., & Akyun, Q. (2023). Identification of Production Decline Factors using the LEAN DMAI Method. Jurnal Ilmiah Teknik Industri, 22(1), 76–85. https://doi.org/10.23917/jiti.v22i1.20013
Lies Suprapti. (2005). Pembuatan Tahu. Kanisius
Sadimin. (2007). Proses Pembuatan Tahu. CV. Aneka Ilmu.
Donald J. Bowersox. (1986). Manajemen Logistik. Integrasi Sistem-Sitem Manajemen Distribusi Fisik dan Manajemen Material.
Philip Kotler & Kevin Lane Keller. (2016). Manajemen Pemasaran. Edisi 13 Jilid 2.
Rasyida, D. R. ., & Ulkhaq, M. M. (2015). Aplikasi Metode Seven Tools Dan Analisis 5W + 1H Untuk. Industrial Engineering Department, Faculty of Engineering, Diponegoro University, 5(4), 1–9.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2025 Ana Yulita Da Silva, Suntoro Suntoro, Rizqi Permana Sari

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.







