PENERAPAN BIM MENGGUNAKAN CUBICOST DALAM PERHITUNGAN RENCANA ANGGARAN BIAYA: STUDI LITERATUR

Authors

  • Raihan Kazam Meindito Universitas Negeri Jakarta
  • Adhi Purnomo Universitas Negeri Jakarta
  • Rezi Berliana Yasinta Universitas Negeri Jakarta

DOI:

https://doi.org/10.31004/joecy.v6i2.11284

Keywords:

Building Information Modeling, Cubicost, Volume, Estimasi Biaya, Building Information Modeling; Cubicost, Volume, Cost Estimation

Abstract

Building Information Modeling (BIM) is a digital innovation in the construction industry capable of simultaneously integrating design data, work volume calculations, and cost estimation within a single integrated platform. This study aims to examine the effectiveness of 5D BIM implementation, particularly using Cubicost software, in the preparation of construction cost plans (RAB) for building construction projects. This research employs a literature review method with a descriptive-qualitative approach through the analysis of eight scientific publications covering various construction project case studies in Indonesia. The findings indicate that the application of 5D BIM using Cubicost is capable of improving cost estimation accuracy with a very small volume deviation rate, ranging from 0.18% to 5%, while also contributing to a reduction in total project costs of up to 11.55% compared to conventional methods. Furthermore, BIM is able to minimize rework potential through the automation of the quantity take-off process and the ease of detecting design conflicts between building elements from the early planning stage. Despite persistent technical challenges such as the need for human resource training, the long-term benefits of BIM are highly significant in supporting improved quality of construction planning and cost control. Therefore, Cubicost as a 5D BIM software tool has been proven to be a strategic instrument that needs to be continuously promoted for wider implementation in Indonesia's construction sector.

 

References

Arifin, M. L. N., Hendrawangsa, P., & Sar, N. K. (2024). Bandingan analisis cost budget plan menggunakan metode konvensional dan metode Building Information Modeling (BIM) 5D dalam pekerjaan struktural. Akselerasi: Jurnal Ilmiah Teknik Sipil, 5, 1–8.

Azhar, S. (2011). Building information modeling (BIM): Trends, benefits, risks, and challenges for the AEC industry. Leadership and Management in Engineering, 11(3), 241–252. https://doi.org/10.1061/(ASCE)LM.1943-5630.0000127

Creswell, J. W., & Creswell, J. D. (2018). Research design: Qualitative, quantitative, and mixed methods approaches (5th ed.). Sage Publications.

Eastman, C., Teicholz, P., Sacks, R., & Liston, K. (2018). BIM handbook: A guide to building information modeling for owners, designers, engineers, contractors, and facility managers (3rd ed.). John Wiley & Sons.

Fajar, R. P., & Fajarwati, A. N. (2026). Implementasi BIM untuk optimasi penjadwalan dan biaya pekerjaan struktural dan arsitektural proyek Rusun ASN 3 IKN. Jurnal Online Skripsi, 7, 233–238.

Ferry, D. J., & Brandon, P. S. (2016). Cost planning of buildings (9th ed.). Wiley-Blackwell.

Hardin, B., & McCool, D. (2015). BIM and construction management: Proven tools, methods, and workflows (2nd ed.). John Wiley & Sons.

Kerzner, H. (2019). Project management: A systems approach to planning, scheduling, and controlling (12th ed.). John Wiley & Sons.

Miles, M. B., Huberman, A. M., & Saldaña, J. (2014). Qualitative data analysis: A methods sourcebook (3rd ed.). Sage Publications.

Monteiro, A., & Martins, J. P. (2013). A survey on modeling guidelines for quantity takeoff-oriented BIM-based design. Automation in Construction, 35, 238–253. https://doi.org/10.1016/j.autcon.2013.05.005

Pradana, C. G., Pratama, R. W., & Halimah, R. S. N. (2023). Pengaplikasian BIM 5D untuk pekerjaan arsitektur pada proyek Gedung IGD RSUD Waras Wiris Boyolali. Jurnal Riset Rekayasa Sipil, 7, 19–27. https://doi.org/10.20961/jrrs.v7i1.79199

Putri, N. A., Purnomo, A., & Khanza, M. (2025). Penerapan Building Information Modeling (BIM) untuk perhitungan rencana anggaran biaya struktur: Studi literatur. Jurnal Pendidikan Tambusai, 9, 22674–22680.

Rahayu, R., & Suseno, D. P. (2023). Analisis perbandingan quantity take off menggunakan BIM Glodon Cubicost dengan Microsoft Excel. Jurnal Teknik Sipil, 16, 1–15.

Sacks, R., Eastman, C., Lee, G., & Teicholz, P. (2020). BIM handbook: A guide to building information modeling for owners, designers, engineers, contractors, and facility managers (4th ed.). John Wiley & Sons.

Seeley, I. H. (2017). Building economics (5th ed.). Macmillan Education.

Setiawati, K., & Sundjava, D. T. (2023). Analisis quantity take off pada pekerjaan arsitek studi kasus Apartemen Garden Serpong. Jurnal Politeknik Astra, 14, 150–155.

Smith, P. (2014). BIM implementation – Global strategies. Procedia Engineering, 85, 482–492. https://doi.org/10.1016/j.proeng.2014.10.575

Snyder, H. (2019). Literature review as a research methodology: An overview and guidelines. Journal of Business Research, 104, 333–339. https://doi.org/10.1016/j.jbusres.2019.07.039

Sugiyono. (2022). Metode penelitian kuantitatif, kualitatif, dan R&D (Edisi ke-2). Alfabeta.

Umam, F. N., Erizal, & Putra, H. (2022). Peningkatan efisiensi biaya pembangunan gedung bertingkat dengan aplikasi Building Information Modeling (BIM) 5D. Teras Jurnal: Jurnal Teknik Sipil, 12, 245–256. https://doi.org/10.29103/tj.v12i1.704

Zed, M. (2018). Metode penelitian kepustakaan (3rd ed.). Yayasan Pustaka Obor Indonesia.

Downloads

Published

26-06-2026

How to Cite

Meindito, R. K. ., Purnomo, A. ., & Yasinta, R. B. . (2026). PENERAPAN BIM MENGGUNAKAN CUBICOST DALAM PERHITUNGAN RENCANA ANGGARAN BIAYA: STUDI LITERATUR. Journal of Innovative and Creativity (Joecy), 6(2), 35430–35439. https://doi.org/10.31004/joecy.v6i2.11284

Issue

Section

Articles