Tang, M. R. N., Kusumawati, E. ., & Widyaningsih, U. . (2026). Analisis Proses Pemuatan Batu Bara secara Ship to Ship di Taboneo Anchorage Wilayah Konsesi PT Indonesia Multi Purpose Terminal. Journal of Innovative and Creativity, 6(1), 2726–2743. https://doi.org/10.31004/joecy.v6i1.6876