[1]
julsena, julsena, Alghifari, M. and Maimun , B.P. 2026. Analisis Pengendalian Biaya Dan Waktu Proyek Konstruksi Menggunakan Metode Earned Value Management. Journal of Innovative and Creativity. 6, 2 (Jun. 2026), 33391–33396. DOI:https://doi.org/10.31004/joecy.v6i2.11702.